Maine’s biggest city didn’t lead the state in backyard cottages and in-law apartments last year. A Lakes Region town did. And the rules have loosened again since.
When people picture an ADU boom, they picture Portland: tight lots, high rents, carriage houses on the West End. The numbers tell a different story. In preliminary 2025 permit data collected by the state and reported by the Press Herald, Windham issued 16 ADU permits, more than any other town that reported. Portland issued 14. So did New Gloucester, a town of fewer than 6,000 people.1
That’s not a fluke of one busy year. It’s what happens when a state law meets towns full of big lots, older parents and grown kids who can’t afford to buy a house.
What counts as an ADU?
An accessory dwelling unit is a fully independent space on the same lot as a house. It has its own kitchen, bathroom and sleeping space. It can be inside the house (a finished basement with its own entrance), attached (an in-law addition), or detached (a cottage in the side yard or an apartment over the garage). Real-estate listings call them in-law suites, carriage houses, guest houses and granny flats. Legally, they’re all the same thing.
What Maine ADU laws allow

Maine passed its ADU law, LD 2003, in April 2022. The bill’s sponsor, then–House Speaker Ryan Fecteau, put it simply: “States all over the country are struggling with housing shortages, and Maine is no exception.”3 Towns had until 2024 to comply. Lawmakers have loosened the rules twice since, with LD 1829 in 2025 and LD 2173 in 2026. Those changes phase in by July 1, 2027. Here’s where things stand this fall.4
Already the law in every Maine town:
- At least one ADU on a lot with a single-family home, anywhere homes are allowed.
- Any of the three forms: inside, attached or detached.
- No extra parking beyond what the main house already requires.
- No blanket ban in the shoreland zone, as long as the project meets state and local shoreland rules.
- ADUs on nonconforming lots, if they don’t make the nonconformity worse.
- No required sprinklers for an ADU at a single-family home (since September 2025).
Coming by July 1, 2027:
- No owner-occupancy requirement. Towns won’t be able to make you live on the property.
- No planning board review for an ADU.
- More lots qualify: ADUs will be allowed with two- and three-unit homes too, and most residential lots can hold three homes, counting the ADU.
One more change matters to a lot of longtime homeowners. Since 2023, a town has to allow an ADU that was built without approval if it otherwise meets the requirements.4 That leaves a path to legalize the “apartment over the garage” that’s been there since the 1990s.
What’s still up to your town
State law sets the floor. Your town controls size caps, setbacks, design standards and fees, so the details vary more than people expect, even between neighbors:14
- Windham caps an “accessory apartment” at 800 sq ft and two bedrooms. It still requires the owner to live on the lot, and its ordinance allows units attached to the house or inside an accessory building like a garage. Every application needs a state-approved septic design.
- Standish, updated in May 2025, allows up to 1,000 sq ft, inside the house or detached, with no owner-occupancy rule.
- Gorham allows 800 sq ft, requires the owner on site, and requires a detached unit on septic to have its own system.
- Gray has already rewritten its rules for the new state law. Its update took effect September 17, 2026.
- Raymond allows up to 1,250 sq ft, as long as the ADU is smaller than the house.
So Windham led the state in ADU permits with some of the stricter rules around, rules that will have to loosen by 2027. For comparison, look closer to the coast:
- Portland has allowed up to two ADUs on residential lots since December 2020. It went from fewer than three ADU permits a year to 40 approvals in 2025.57
- South Portland bans rentals shorter than 30 days anywhere on an ADU property. Its application fees total about $500.6
- Scarborough was allowing ADUs long before the state required it. The town has roughly 200, adding 10 to 12 a year since 2003.7
In Windham, Standish, Gorham and the Lakes Region towns, though, the land usually matters more than the ordinance. Most lots are on private wells and septic, and many sit near a lake or stream. Those two facts shape an ADU more than any rule book. Ordinances change, so always confirm the current version with your code office.
Why it’s catching on
If ADUs are legal almost everywhere, why aren’t there more? Mostly awareness and cost. “Some things catch on like wildfire. This is not something that has,” Tanya Emery of the Maine Municipal Association told the Press Herald this spring.8 Former state Sen. Matt Pouliot put it more bluntly: “There’s a lot of people that still don’t even know about LD 2003.”8
But the trend is clearly upward. ADUs made up about 7% of the 7,499 new homes Maine permitted in 2025.9 In the 29 communities of the Greater Portland Council of Governments, preliminary data shows detached ADUs up almost 30% in a year, from 136 to 176.10 GPCOG’s executive director, Kristina Egan, admitted the data changed her mind:
“Before we saw this data, I thought ADUs would be a very small piece of the solution… It’s an approach that nestles housing into existing neighborhoods without disrupting them.”
Kristina Egan, GPCOG, in the Press Herald, May 2026
For context, Maine is short about 38,500 homes today and needs roughly 76,000 to 84,000 more by 2030.11 Nobody thinks backyard cottages solve that alone. But for one family (a parent who needs to downsize, a grown kid priced out of Cumberland County), one ADU solves a lot.
If you’re thinking about one, start here
- Find your septic design. Maine’s wastewater rules size systems by bedroom. Adding one or two bedrooms may mean an expanded system designed by a licensed site evaluator.12
- Check for water within 250 feet. Lots near great ponds, larger rivers or wetlands fall in the shoreland zone, where setbacks and expansion limits apply.13
- Ask your code office for the ADU section of the land-use ordinance, especially the size cap and setbacks.
- Look at what’s already standing. A garage, barn or walkout basement is often the fastest, cheapest ADU you can build.
Want a second set of eyes on your lot? Kota does free ADU lot checks across southern and western Maine. See how we make ADUs happen →
Sources
- Hannah LaClaire, “More ADUs were built in Maine last year than expected,” Portland Press Herald, May 20, 2026. pressherald.com
- Office of Gov. Janet Mills, bill-signing release, April 27, 2022. maine.gov
- 30-A M.R.S. §4364-B; Maine Office of Community Affairs, Housing Legislation Guidance, March 2026. statute · guidance
- City of Portland Permitting & Inspections, Zoning FAQ, Jan. 2025. portlandmaine.gov
- City of South Portland, ADU Guidebook (Apr. 2023) and ADU web page. southportland.gov
- “The state wants ADUs. Cities and towns are seeing mixed results,” Press Herald, May 7, 2026. pressherald.com
- Hannah LaClaire, “ADU construction in Maine hasn’t matched interest,” Press Herald, May 7, 2026. pressherald.com
- Office of Gov. Mills, 2025 housing production data, June 26, 2026. maine.gov
- Hannah LaClaire, “How a landmark 2022 law set the stage for increased interest in ADUs,” Press Herald, May 5, 2026. pressherald.com
- State of Maine Housing Production Needs Study, Oct. 2023. maine.gov
- Maine Subsurface Wastewater Disposal Rules, 10-144 CMR ch. 241. maine.gov
- Maine DEP, Shoreland Zoning. maine.gov
- Town ordinances: Windham Ch. 120 §120-501 (11-14-2023) ecode360; Standish Ch. 181 §181-35.5 (5-13-2025) ecode360; Gorham LUDC Sec. 2-4.C ecode360; Gray Ch. 402 §402.7.9 (eff. 9-17-2026) graymaine.org; Raymond §300-9.26 ecode360.